翻訳と辞書 ・ Waterboro, Maine ・ Waterboro, New York ・ Waterborough Parish, New Brunswick ・ Waterborough, New Brunswick ・ Waterboy (song) ・ Waterboys (film) ・ Waterbuck ・ Waterbug ・ Waterbug Records ・ Waterbury (Amtrak station) ・ Waterbury (disambiguation) ・ Waterbury (Metro-North station) ・ Waterbury (village), Vermont ・ Waterbury Airport (Connecticut) ・ Waterbury Arts Magnet School ・ Waterbury Branch ・ Waterbury Career Academy ・ Waterbury Catholic High School ・ Waterbury Center Methodist Church ・ Waterbury Dam ・ Waterbury Municipal Center Complex ・ Waterbury Public Schools ・ Waterbury Township, Redwood County, Minnesota ・ Waterbury Traction Company ・ Waterbury Union Station ・ Waterbury, Connecticut ・ Waterbury, Connecticut, minor league baseball ・ Waterbury, Florida ・ Waterbury, Nebraska ・ Waterbury, Vermont
|
|
Waterbury Branch : ウィキペディア英語版 | Waterbury Branch
Metro-North Railroad's Waterbury Branch is a branch of the New Haven Line, running north from a junction in the Devon section of Milford to Waterbury. Originally built as the Naugatuck Railroad, it once continued north to Winsted. The part north of Waterbury is now leased from CDOT by the Railroad Museum of New England, which operates excursion trains from Thomaston station through their operating subsidiary Naugatuck Railroad ; this name was chosen in homage of the original railroad. The trackage ends in Torrington but Metro North service on the branch ends at Waterbury. There are conceptual plans to extend service from its current terminus in Waterbury to Hartford via Bristol and New Britain. Except for one weekday off-peak train that operates from Stamford to Waterbury, all trains on this branch operate as shuttles between Waterbury and Bridgeport. ==Upgrades== In September 2015, it was announced that out of Governor Malloy's 30 year-$100 Billion transportation plan, $350 Million has been included to improve service along the branch. 〔http://www.foxbusiness.com/markets/2015/09/02/waterbury-branch-commuters-using-metro-north-to-hear-details-on-connecticut/〕 The upgrades include a new signal system with multiple passing sidings to increase service, newer equipment, and station rehabilitation. The passing sidings are expected to be completed in 2018. Work began on a siding just north of the Derby-Shelton station and is expected to be completed in late 2015.〔http://www.rep-am.com/news/local/905389.txt〕CTDOT also purchased locomotives from NJ Transit that, once overhauled, will be put into branch line service.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Waterbury Branch」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|